Client

spitäler fmi ag Spital Interlaken

Architect/General planner

Itten+Brechbühl AG

Planning

2007-2008 / 2008 / 2010

Start of construction

2008 / 2008 / 2012

Start of operation

2008 / 2009 / 2016

Floor area

4850 m2

Construction volume

18 325 m3

Photos

Sandra Stampfli, Bern
Hanspeter Bärtschi, Spiegel bei Bern

Aerial photograph: © Rega

Back

Interlaken, Switzerland

fmi Regional Hospital

Alterations and extensions while hospital is running

An overall concept was drawn up for the Interlaken hospital in 2010 which comprised the renovation of the operating theatre section and A&E. The obligatory earthquake and fire prevention measures resulted in House E being cleared, the outpatients' clinics being set up there and all nursing departments being moved to House K onto which further floors were added. The operating theatre section was soon faced with the necessity of an extension to the east. The façade of the pavilion-like operating theatre wing consists of a translucent double glass shell. In the interior, insights gained from "healing architecture" were implemented.

The helicopter landing pad is situated on the roof of the new operating wing. The next step is to enlarge the A&E department to twelve treatment bays.

More projects