Client

VAMED GmbH

Architect

Itten+Brechbühl AG

Planning

December 2012

Start of construction

Autumn 2013

Start of operation

Spring 2014

Floor area

4245 m2

Construction volume

14 000 m3

Minergie

Standard

Photos

Markus Schmid, Kreuzlingen

Back

Zihlschlacht, Switzerland

Zihlschlacht Rehabilitation Clinic

Since its inception in 1891 as mental hospital, the rehabilitation clinic has retained its villa-like character in the middle of a park. Now the facility is to be expanded to include two new buildings of which one will be built for the meantime.

New main entrance, new wing: privacy and nature

The three and a half storey structure comprises three wards. A skywalk serves as the connection to the existing facility. Its position in the terrain and the large glazed area of the entrance hall define the building as the new main entrance to the clinic site.

To break up the building lengthwise, the house is divided into two tapering, nested structures. This avoids a daunting alignment of rooms. A feature of the wards is the increasing level of privacy the further you penetrate.

More projects