Client

Canton de Vaud Office des Constructions des Hospices Vaudois

Architect

Itten+Brechbühl AG

Construction management

Tekhne SA

Start of construction

2017

Start of operation

2022

Floor area

5460 m2

Construction volume

20 311 m3

Operating rooms

14 (including 2 hybrid robotic rooms and 1 MRI room)

Back

Lausanne, Switzerland

CHUV - University Hospital

The central operating theatre of the CHUV is one of the largest in Switzerland. After 30 years of use and more than 10,000 surgical operations per year, the 18 rooms of the operating theatre of the University Hospital of Vaud had to be adapted to current needs.

The new operating theatre now meets hospital requirements and, in line with the standards and research activities of the CHUV, will contribute to technical progress.

The aim of the modernisation work was to rationalise work processes, including the movement of people and equipment, and the organisation of medical devices. The technical equipment was replaced in all its complexity and the most modern materials were used.

Itten+Brechbühl AG is responsible for coordinating the work with the specialist engineers, the users and the client, and for the architectural supervision of the project. In order to ensure the continuity of the operation, a prefabricated structure was built on the roof of the intensive care building for the duration of the construction.