Interlocuteur

Robin Kirschke

Maître d'ouvrage

Hôpitaux universitaires de Genève Services Etudes & Constructions (SEC)

Architecte

Itten+Brechbühl SA

Etudes

2017

Début des travaux

12. 2019

Mise en service

09. 2023

Surface

6650 m2

Volume de construction

29 403 m3

Visualisations / Photos

Yos, Zurich / HUG

Back

Geneva, Switzerland

Emergency, HUG - University Hospitals

Client Hôpitaux universitaires de Genève, Service Etudes & Constructions
Planning / Construction 2017-2023
Architecture Itten+Brechbühl SA
Surface area 6'650 m2
Construction volume 29'403 m3

Now spanning over 6,650 square meters, the emergency department has been restructured, renovated, and expanded to meet rising patient numbers while enhancing reception quality, patient care, and the working environment for medical staff.

The internal layout of the emergency department was comprehensively reconfigured. Functional connections between different zones and a flexible structural approach were introduced to meet current demands and future developments in emergency medicine. A long-term strategy was adopted, separating primary (load-bearing), secondary (non-load-bearing), and tertiary (technical) systems.

Special care was taken to integrate the new elevated entrance area into the existing complex. The façades were designed to form a coherent architectural language across all buildings on site.

One of the greatest challenges was to carry out the extension and renovation work without interrupting the emergency department’s continuous 24/7 operations. To meet this requirement, the project was divided into 12 phases. Temporary service routes ensured uninterrupted functioning over the 48-month construction period.