Client

Borough of Buchs / Regensdorf/Buchs/Dällikon Secondary School

Architect/General planner

Itten+Brechbühl AG

Competition with pre-qualification

2014-2015

Planning

2015-2018

Start of construction

2017

Start of operations

2018/2019

Bauvolumen

44 300 m3

Indietro

Buchs, Switzerland

Scuola di Petermoos e nuova costruzione della sala comunale

Cliente Gemeinde Buchs / Sekundarschule Regensdorf/Buchs/Dällikon
Concorso 2014-2015
Progetto / Realizzazione 2015-2019
Prestazioni IB
  • Pianificazione Generale
  • Architettura
Architettura Itten+Brechbühl AG
Pianificazione generale Itten+Brechbühl AG
Volume della costruzione 44'300 m3

Competition 1st prize

The integration of public and school usage is established in the dovetailing of the folded basement level

Community hall, library and a triple gymnasium are combined in one building complex and form the representational point of entry to the whole facility with an entrance area to match. A second building at the level of the existing school complex houses the schoolroom extension and the work centre. A precisely defined exterior space stretches between the two building complexes, and can be used as an area for breaks and as a sports ground.

Altri progetti