Client

Kanton Solothurn, Bau- und Justizdepartement, Hochbauamt

Stage 1

Architect/General planner: Itten+Brechbühl AG
Start of construction: 1995
Start of operations: 2000
Floor area: 24 780m2
Award: «Auszeichnung guter Bauten 1998» for renovation of the staff block

Stage 2

Architect/General planner: Itten+Brechbühl AG
Start of construction: 2007
Start of operations: 2012
Floor area: 20 850m2
Photos: Philipp Zinniker, Bern; Hanspeter Bärtschi, Spiegel b. Bern; Marcel Fässler, Muotathal SZ; Björn Allemann, Zürich

Multi-storey car park

Study contract: 1st rank 2010
General planner: HRS Real Estate AG
Architects: Itten+Brechbühl AG; Frey Architekten Olten
Start of construction: 2012
Start of operations: 2013
Floor area: 14 592m2
Construction volume: 47 075m3
Parking spaces: 460
Roof area: 3000m2

Annual energy use Photovoltaic installation: kWh 200 000
Photos: Hanspeter Bärtschi, Spiegel b. Bern

Zurück

Olten, Switzerland

Kantonsspital und Parkhaus

Programm Mehrstufige Sanierung und Erweiterung des Kantonsspitals Olten mit dem Bau einer neuen Behandlungseinheit, eines Bettenpavillons und eines Parkhaus (47 075m3) mit einer Photovoltaikanlage mit einem Jahresertrag von 200'000 kWh
Auftraggebende Kanton Solothurn, Bau- und Justizdepartement, Hochbauamt
Auftrag 1995; Parkhaus: 2010, 1. Rang
Planung / Ausführung 1. Etappe: 1995 / 2000 2. Etappe: 2007 / 2012 Parkhaus: 2012 / 2013
Architektur 1. / 2. Etappe: Itten+Brechbühl AG
Parkhaus: Itten+Brechbühl AG; Frey Architekten Olten
Generalplanung 1. / 2. Etappe: Itten+Brechbühl AG
Parkhaus: HRS Real Estate AG
Geschossfläche 60'222 m2

Conversion, refurbishment and new construction of a treatment wing, a ward block and a car park.

Long-term transformation towards the future

The gradual conversion, refurbishment and modernisation of the Olten Cantonal Hospital took place over a long period from 1995 to 2012. After completion of the 1st stage in 2000 with the construction of a treatment wing and a ward block, the 2nd stage followed with the construction of a new ward block and treatment wing.

A unified design concept applies to the very different buildings on the hospital site. Glass with a greenish shimmer encases all the new buildings like an outer skin on the façade. When the car park was built, here too great importance was attached to the design of the building envelope.

As the general planners in this complex, lengthy process lasting many years, IttenBrechbühl were responsible for coordinating the twelve planning offices involved - all of which had to be done while the hospital was running.

Interior Design

Outstanding hospital building. In the interior, boldly-coloured furnishings contrast with sombre hospital white. The work received the «Auszeichnung guter Bauten» (Good Building Award) by the Cultural Promotion Office of the Canton of Solothurn in 1998.

Weitere Projekte