Client

Holdigaz

Architect

Itten+Brechbühl AG

Competition

1st rang 2012

Planning

2013

Start of construction

2014

Start of operations

2015

Floor space

9800 m2

Construction volume

35 000 m3

Workplaces

200

Parking spaces

130

Photos

Franziska Werren

Retour

Forel, Switzerland

Bâtiment administratif et industriel HOLDIBAT

Programme 200 places de travail
130 places de parking
Maître d’ouvrage Holdigaz
Concours 1er prix 2012
Planification / Réalisation 2013 / 2014-2015
Architecture Itten+Brechbühl SA
Surface de plancher 9'800 m2
Volume de construction 35'000 m3

Forel lies to the north east of Lausanne. A new administrative and industrial building is under construction in the industrial area.

Pragmatic angular design produces elegant form

The outline of the building is slightly angled in order to make the best possible use of the land available.  The structure is simple and linear. The vertically divided façade has long window strips.

The height of the building at 10.5 metres offers space for a warehouse and workshop as well as two office floors. The top floor offers a cafeteria and terrace, a conference room and further office space. The underground car park makes maximum use of the space available.

The internal organisation is defined by the three service cores which divide the space and serve as acoustic filters between the various types of use.

Autres projets