Client

Spital STS AG

Architect/General planner

Itten+Brechbühl AG

Full-service general contractor

Itten+Brechbühl AG

General contractor competition

2010

Planning

2011; N2 2012

Start of construction

2011; N2 2012

Start of operation

2012; N2 2014

Floor area

4217 m2

Construction volume

13 876 m3

Minergie

Standard

Photos

Sandra Stampfli, Bern

Back

Thun, Switzerland

Thun Hospital: Integration of A&E into existing structure; 2nd floor extension (strategic free space)

A&E becomes an emergency

The A&E department at Thun hospital dates back to 1987 and was designed for 8,000 cases per year. Today, 10,000 cases are expected. There was urgent need of expansion. The new two-storey building is embedded in the existing ensemble,in the heart of the hospital buildings. The building is designed as a frame construction with prefabricated concrete columns. The internal work is of lightweight construction with gypsum board walls. The arrangement of the rooms enables parallel treatments to run smoothly and effectively. The spatial design comprises 19 emergency beds, a shock room, X-ray department, rooms for minor procedures, gynaecology room, plaster room, isolation rooms, decontamination rooms and triage area. 

Interior Design

Limited expansion. The new arrangement of the rooms corresponds to current medical and technical standards and facilitates smooth processes during parallel treatments. The treatment rooms have a restrained design that relinquishes the space to the striking signage and eminent core zones. 

More projects