Back

Wetzikon, Schweiz

Headquarter Elma

Client Elma Electronic AG
Services provided by IB
  • General Planning
  • Construction Management
Architecture Duplex Architekten AG, Zürich
Surface area 7'950 m2

As lead planners, we are responsible for transforming Elma’s headquarters into an innovative, future-oriented workplace nestled in greenery. Instead of erecting a replacement building, the original 1969 production facility will be preserved and stripped back to its load-bearing precast concrete frame. The project centers on a resource-efficient approach to the existing structure: complemented by new vertical cores and a lightweight interior fit-out, the result is a flexible and adaptable working environment.

A finely articulated façade drapes the volume like a woven textile, improving energy performance and lending the building a distinctive and representative presence. For the first time, production, logistics, development, and sales will be housed under one roof. Central communication hubs—including a three-story entrance hall, an open town hall with tiered seating, and a forest-edge break area—are designed to foster interdisciplinary exchange.

The energy concept integrates reuse, photovoltaics, and heat recovery. Embedded in a nature-oriented “forest campus” of trees, clearings, and minimally paved paths, the building at the forest’s edge becomes a building within the forest.

More projects