Client

Amt für Grundstücke und Gebäude–AGG


Architect

Itten+Brechbühl AG

Planning

2014-2015

Start of construction

September 2015

Start of operation

June 2016

Floor area

1235 m2

Construction volume

6700 m3

Photos

Philipp Zinniker, Bern

Zurück

Bern, Switzerland

Institut für Biochemie und Molekulare Medizin (IBMM) der Universität Bern

Auftraggebende Amt für Grundstücke und Gebäude–AGG
Planung / Ausführung 2014 / Juni 2016
Leistung IB
  • Architektur
Geschossfläche 1'235 m2
Bauvolumen 6'700 m3

Conversion for temporary use

The 1963 building at no. 5 Gertrud-Woker-Strasse, a three-storey cubic structure built in concrete, will be temporarily used by the Institute of Biochemistry and Molecular Medicine (IBMM) at the University of Bern from 2016 until around 2022. Accordingly, the conversion was performed with the smallest possible impact and at low cost while still fulfilling the requirements of a level 3 biosafety laboratory.

The main challenge was to implement the safety requirements of a level 3 laboratory with extensive technical systems in the existing building and in compliance with the cost ceiling and deadlines. IttenBrechbühl achieved all of this with great precision – much to the satisfaction of the client.