Client

UCB Farchim S.A.

Architect

Itten+Brechbühl AG

Planning

2011-2012

Start of construction

2012

Start-up of operations

2014

Floor space

24 450 m2

Workplaces

130

Photos

Vincent Jendly, Lausanne

Zurück

Bulle, Switzerland

Bioreaktor UCB

Auftraggebende UCB Farchim S.A.
Planung / Ausführung 2011-2012
Leistung IB
  • Architektur
Architektur Itten+Brechbühl AG
Geschossfläche 24'450 m2

For the production of its drug Cimzia, UCB has built a new production facility with three bioreactors in Bulle, Freiburg, which is one of the most modern plants for biotech drugs in the world.

The reflective shell of the building alleviates the effect of planting such a straight-lined structure in an Alpine setting. The mathematical language of the façade shows the various functions of the building. The interior design is an open network which creates a clear structure. Maximum use is made of the available space.

The usages are complex: three reactors for which 33 kilometres of pipelines were laid, cleaning and storage tanks, labs for quality assurance, maintenance and storage space as well as offices.

Weitere Projekte